Jump to content Jump to navigation Jump to search

Replacewithtranslations
Global
Replacewithtranslations
Albania
Replacewithtranslations
Brazil
Replacewithtranslations
Chile
Replacewithtranslations
France
Replacewithtranslations
Germany
Replacewithtranslations
India
Replacewithtranslations
Ireland
Replacewithtranslations
Netherlands
Replacewithtranslations
Norway
Replacewithtranslations
Peru
Replacewithtranslations
Spain
Replacewithtranslations
Sweden
Replacewithtranslations
Turkey
Replacewithtranslations
United Kingdom
Replacewithtranslations
United States

Moglicë HPP

Moglicë HPP is the largest HPP in the frame of the Devoll Hydropower Project.

Moglicë HPP is developed in the area of Maliq and Gramsh Municipalities, respectively Korçë and Elbasan Districts.

The implementation of the construction activities started in 2015 with planned completion in 2020. The works are implemented by specialized international and national contractors.

Moglicë HPP utilizes a head of 300 m between 650 and 350 m above sea level. The approx. 167 m high dam is an asphalt-core rock-filled structure, one the highest of its kind in the world. The reservoir has a storage capacity of approx. 380 million m³. The reservoir is planned to have a surface area of approx. 7.2 km².

The Moglicë Power Plant receives the water through a 10.7 km long tunnel from the Moglicë reservoir. Moglicë HPP will use two Francis turbine units. Moglicë HPP is equipped with two large Francis turbine units and a small eco-flow unit located at the foot of the dam. The installed capacity is 197 MW with an average generation of 450 GWh/year.